Almost every answer online says “one to two bags.” That range is wide enough to be useless, and it's often wrong. Here are the real numbers by hole size — and the formula behind them, so you can check any post on your own fence line.

The post size barely matters — the hole size decides everything

A 4×4 post displaces about 0.09 square feet of the hole's cross-section. A 12-inch hole has 0.79 square feet. So the concrete you actually pour is the ring around the post, and that ring grows much faster than the post does. Going from an 8-inch hole to a 12-inch hole at the same depth more than doubles the concrete required, while going from a 4×4 post to a 6×6 changes very little.

This is why “two bags per post” advice falls apart. Two bags is right for a shallow, narrow hole. In a 12-inch hole 36 inches deep you'd be short by half.

The formula, so you can verify the chart

Concrete needed is the volume of the hole minus the volume of the buried post:

concrete (cu ft) = (π × r² × depth) − (post width × post depth × depth)

r = hole radius. Keep every measurement in feet: an 8-inch hole has r = 0.333 ft, and 24 inches deep is 2 ft.

Bag yields are the standard mix figures — 40 lb ≈ 0.30 cu ft, 50 lb ≈ 0.375, 60 lb ≈ 0.45, and 80 lb ≈ 0.60. Those are the same numbers the concrete calculator uses. That last one is the useful landmark: since a cubic yard is 27 cubic feet, it takes 45 bags of 80 lb to make a yard. Past about a yard, bags stop being the sensible way to buy concrete.

One note on the charts below: bag counts are calculated from the exact volume, not the rounded figure in the first column. A 12-inch hole 36 inches deep prints as 2.10 cu ft, but the true volume is 2.101 — fractionally over seven bags of 40 lb mix, so the chart shows 8. Rounding the printed number down would leave you a shade short of filling the hole.

Chart: 4×4 posts (actual 3.5 in)

Nominal 4×4 lumber measures 3.5 inches square. The post volume is already deducted below, so these are bags to actually buy.

Concrete bag counts per 4×4 fence post by hole diameter and depth
Hole dia × depthConcrete (cu ft)40 lb50 lb60 lb80 lb
8" × 24"0.532221
8" × 30"0.663222
8" × 36"0.793322
10" × 24"0.924332
10" × 30"1.154432
10" × 36"1.385443
12" × 24"1.405443
12" × 30"1.756543
12" × 36"2.108654

Buy for the worst post on the run, not the average. Hole diameters wander when you're digging clay or hitting roots, and one oversize hole can eat an extra bag.

Chart: 6×6 posts (actual 5.5 in)

The thicker post removes more volume, so these run slightly under a 4×4 in the same hole — but a 6×6 usually means a bigger, deeper hole, which more than makes up the difference.

Concrete bag counts per 6×6 fence post by hole diameter and depth
Hole dia × depthConcrete (cu ft)40 lb50 lb60 lb80 lb
12" × 24"1.154432
12" × 36"1.736543
14" × 24"1.726543
14" × 36"2.589765
16" × 24"2.378764
16" × 36"3.56121086

How deep and how wide

Two rules of thumb do most of the work, and they're both about stability rather than strength:

  • Depth: one-third of the above-ground height. A post standing 6 feet above grade gets 2 feet in the ground. Below 24 inches, fence posts start levering loose in soft soil.
  • Diameter: about 3× the post width. A 3.5-inch 4×4 wants a 10- to 12-inch hole. Wider than that mostly buys concrete consumption.

In cold climates, push depth toward 36 inches so more of the footing sits below the active frost layer. Frost heave lifts posts unevenly, and a heaved fence line is expensive to fix.

Fast-set vs regular mix

Fast-setting post mix can go into the hole dry — set the post, pour, add water, done. No wheelbarrow, no mixing paddle, no cleanup. Regular concrete mix costs less per bag but has to be mixed first. On a 20-post fence line, the mixing is the whole job, so most people pay the premium.

Run your own post count

The concrete calculator has a Post hole mode built for exactly this, and that link opens it on the 12-inch hole 3 feet deep around a 4×4 from the chart above — four bags of 80 lb mix, with the buried post deducted. Change the diameter, depth, and post size to your own, then multiply by your post count. It applies the waste factor too, and shows the cubic yards alongside the bags so you can see when it's time to call a ready-mix truck instead of stacking bags.

Common questions

How many bags of concrete do I need per 4×4 fence post?

Most fence posts land in the 2-4 bag range. A 4×4 in a 10-inch hole 24 inches deep needs about 0.92 cubic feet of concrete — 2 bags of 80 lb, 3 of 60 lb, or 4 of 40 lb. Go to a 12-inch hole at 36 inches deep and it roughly doubles to 4 bags of 80 lb. The hole size drives the answer far more than the post size does.

Is 2 feet deep enough for a fence post?

For a 6-foot fence, 24 inches is the practical minimum and 30-36 inches is better. The working rule is to bury one-third of the post's above-ground height, so a post standing 6 feet above grade wants roughly 2 feet in the ground. In cold climates, going to 36 inches puts more of the footing below the active frost layer, which reduces heaving over winter.

Can I pour concrete mix straight into the hole without mixing it?

With a fast-setting post mix, yes — that's exactly what it's formulated for. You set the post, pour the dry mix around it, then add water and let it set. Standard concrete mix has to be mixed in a wheelbarrow or bucket first. Fast-set is convenient but costs more per bag, so it makes the most sense on small jobs where mixing is the annoying part.

Should I put gravel in the bottom of a post hole?

It depends which problem you're solving. A 4-6 inch gravel layer at the bottom drains water away from the post's end grain, which slows rot in the buried section — worth doing with wood posts in wet soil. But gravel does not replace concrete for holding the post plumb, and in fast-draining sandy soil it mostly just wastes hole depth. If you do add gravel, dig the hole deeper so it doesn't eat into your concrete depth.

What is the 4-2-1 rule for concrete?

It's a field-mix ratio — roughly 4 parts gravel, 2 parts sand, 1 part cement by volume. You do not need it for fence posts: bagged concrete mix is already blended to a consistent ratio and its yield (0.60 cubic feet per 80 lb bag) is printed on the bag. Mixing your own is only worth it on pours measured in cubic yards, not bags.

Bag counts are rounded up, so you will usually have some left over. Hole diameters vary in real ground — measure a few holes and size to the largest. For structural posts carrying a load, consult an engineer.